Architect, maître d'œuvre or house builder in France: which to choose?

There are three ways to have a house built in France. They do not offer the same guarantees, the same design freedom or the same role on site.

Updated 27 October 2026

The architect: a protected title and a bespoke design

Only people registered with the Ordre may call themselves architects. An architect designs a project for your plot, prepares the permit and, with a full mission, chooses the builders with you and runs the site. You sign directly with each builder, or with a general contractor. An architect is compulsory above 150 m² of floor area for an individual, and for any company.

The maître d'œuvre: an unregulated profession

Maître d'œuvre describes a role, not a regulated title: an engineering office, a construction economist or a professional with no particular qualification. A maître d'œuvre who is not an architect may only prepare a building permit where no architect is required, that is, for an individual at or below 150 m² of floor area. Check their insurance and references carefully.

The house builder and the CCMI: guaranteed price and delivery

The house-building contract (contrat de construction de maison individuelle, CCMI), created by the law of 19 December 1990, strictly regulates builders of houses with no more than two dwellings:

  • a fixed, final price and a delivery guarantee: if the builder fails, a guarantor takes over completion at the agreed price and deadline, subject to any excess set in the contract;
  • a 10-day withdrawal period;
  • capped payments at each stage: 15% at site opening, 25% at foundations, 40% at walls, 60% when watertight, 75% when windows are in, 95% when fittings are complete, the balance at handover;
  • late-delivery penalties of at least 1/3,000 of the price per day.

In return, the builder controls the design, often from a catalogue, and the choice of trades. If the house exceeds 150 m² of floor area, the permit design must still be signed by an architect.

In short

ArchitectMaître d'œuvreHouse builder (CCMI)
TitleProtected, registered with the OrdreUnregulatedBuilding company
DesignBespokeVariesOften from a catalogue
Cost of worksContracts signed with buildersContracts signed with buildersFixed, final price
Above 150 m²CompulsoryCannot sign the permit aloneAn architect's signature is needed

When to choose which?

  • Architect: a bespoke house, a difficult plot, renovating or extending an existing building, a project above 150 m².
  • CCMI: you want a single price and a delivery guarantee, and accept a more standard design.
  • Non-architect maître d'œuvre: a small project under 150 m² on a tight budget, provided you check insurance and references.

Further reading (in French): the consumer authority's page on the CCMI.

Frequently asked questions

Can a maître d'œuvre file a building permit?

Yes, but only where an architect is not compulsory: for an individual building for themselves with 150 m² of floor area or less.

What guarantees does a CCMI give?

A fixed, final price, a guarantee of delivery at the agreed price and deadline, a 10-day withdrawal period and capped payments at each stage of the works.

Does a house builder need an architect?

Yes, if the house exceeds 150 m² of floor area or is built for a company: the permit design must then be signed by an architect.